![]() |
Die Schnellboot-Seite |
Picture-Series of "Libelle" (Projekt 131) | |
|
Series of
Pictures Small-Torpedo-S-Boat "Libelle" (Projekt 131)
The pictures were
provided to us by Kapitän zur See a.D. (VM) Dr. Hans Mehl. Production
Hall at VEB Shipyard Rechlin Sides of th
hull are erected The hull is
taking shape Hull and
Superstructure just before Finishing Covered the
Boat is transported on the Landway Verry narrow Overlandtransport
on narrow Streets Arrival at
Wolgast for Final Outfit Store for
Torpedotubes and Minethrowers Torpedotube
ready for Mounting Minethrowers Minethrower
ready for Installation Test-Setup
for Minethrower Test
succesful Store for
Electronic Equipment Engineroom Engineroom Crewe-Quarters The Crew has
moved in Boat 998 is
put to Sea Navalised
23mm Dobbel-mounted Gun ZU 23 with Weather-protection Shield Equipmentroom Equipmentroom Tube 2 is
loaded Tube 1 is
loaded Taking Mines Mine is
loaded Mine is made
ready Superstructure
and Conning station with Canvas-Shelters on each side in the
Transportversion Dropping
Frogmen Picking up
Frogmen One is still
in the Water View of the
Stern-Area with Bb-Torpedotube
|